First photo shows the degree to which parts are prepped before final restoration. Then frame being pinstriped. A typical wheel restoration; this one being a combination of the main wheel and cam used to actuate the hour strike hammer. First shown after degreasing, then being prepped for lacquering and after painting. Last photo shows completed going train epicyclical winding drum as compared to the hour and quarter strikers yet to be done.

DSC07100.JPG (554784 bytes)  DSC07969.JPG (839935 bytes) 

DSC07964.JPG (820229 bytes)  DSC08023.JPG (870833 bytes)

DSC08126.JPG (894130 bytes)  DSC08736.JPG (862707 bytes)

DSC08817.JPG (860410 bytes)  DSC08811.JPG (831919 bytes)

DSC08740.JPG (874213 bytes)  DSC08106.JPG (830781 bytes)

Back Up Next